Azentro

Engineering Services

Engineering Designs & Drawings

We provide detailed engineering drawings and layouts required for construction, installation and project execution.

  • • Single Line Diagrams
  • • Piping Isometric Drawings
  • • Substation Layouts
  • • Cable Routing Layouts
  • • Wiring Diagrams
  • • Process Flow Diagrams
  • • Instrument Hook-up Drawings
Engineering Designs & Drawings

Engineering Analysis

Our engineering team performs technical calculations and system evaluations.

  • • Earthing Calculations
  • • Cable Sizing
  • • Power Load Calculations
  • • Voltage Drop Calculations
  • • Control Valve Sizing
  • • Pipe Stress Analysis
  • • Energy Balance Calculations
Engineering Analysis

Technical Documentation

We prepare detailed engineering documentation required for project execution.

  • • Bill of Materials
  • • Electrical Data Sheets
  • • Instrument Specifications
  • • Material Take Off
  • • Piping Specifications
  • • Process Design Basis
  • • Operating Philosophy
Technical Documentation

Modeling & Visualization

We develop detailed 3D engineering models and digital visualizations.

  • • PDMS / AVEVA E3D Modeling
  • • Dialux Lighting Simulation
  • • ETAP Power System Studies
  • • AutoCAD Plant 3D
  • • Navisworks Clash Detection
  • • Plant Layout Visualization
Modeling & Visualization

Project Planning

Structured planning, scheduling, and monitoring for project success.

  • • Project Organization Chart
  • • WBS Development
  • • Schedule Development
  • • Cost Flow Analysis
  • • S-Curve Generation
  • • Progress Monitoring
Project Planning

Procurement Support

Supporting procurement through technical documentation and vendor coordination.

Vendor Documentation

  • • Technical Requisition Preparation
  • • Vendor Data Review
  • • Technical Bid Evaluation

Procurement Engineering

  • • Material Requisition (MR)
  • • Vendor Offer Comparison
  • • PO Technical Attachments

Material Management

  • • MTO Verification
  • • VDR Management
  • • ITP Review
Procurement Support